December 25, 2024

46000 T / a precast building materials project

Project Name: 46000 tons of precast building materials project with an estimated total investment of 92 million yuan.

Project construction location: Southwest Industrial Park, Karamay district.

Planned construction scale: the project covers an area of 25912.95 square meters (equivalent to about 38.85 mu).

The planned total construction area of the project is 32391.19 square meters, including 23142.24 square meters of the planned main project, with an annual output of 46000 tons of precast building materials.

Main contents of the project: the estimated fixed asset investment is 77.5329 million yuan, including the construction of main works, warehousing works, power supply and distribution works, water supply and drainage works, service works, fire protection and environmental protection works, project general drawing works, greening works, etc.

The project plans to purchase a total of 72 sets of equipment, mainly including traveling crane, loader, cutting machine, mixer, steel bending machine, steam curing equipment, mold, straightening machine and other equipment, with a purchase cost of 24.2149 million yuan.

Product resources and raw material supply: the main raw materials and auxiliary materials required by the project include cement, sand, steel, concrete, etc.

Karamay can fully ensure the supply of raw and auxiliary materials required by the project.

Industry of the project: the development of precast buildings is a major change in the construction mode, which is conducive to saving resources and energy, reducing construction pollution, and improving labor production efficiency and quality safety level.

In recent ten years, with the rapid development of economy, the rise of labor cost, the improvement of precast component processing accuracy and quality, the construction technology and management level of precast buildings, and the promotion of national policy factors, precast buildings have warmed up again and presented a trend of rapid development.

Advantage analysis: precast buildings around Karamay are generally in their infancy.

According to the action plan for precast buildings in the 13th five year plan, the proportion of precast buildings in new buildings will reach more than 15% by 2020; Karamay is within 300 kilometers from Altay, Tacheng, Shihezi and Kuitun, which is just within the radiation distance of precast buildings; Karamay has a good industrial foundation; Suitable for the production and promotion of precast buildings; The supply of raw materials is sufficient and the cost is equivalent to that of the surrounding areas.

Market demand forecast: according to the plan, the proportion of precast buildings in China will reach 30% in 2025.

At present, precast buildings in Xinjiang are in their infancy,.

Only the annual housing construction market in our city is about 4 billion yuan, if it reaches 30%, it will be about 1.2 billion yuan.

Considering the needs of surrounding areas, the market prospect is broader.

Economic benefit prediction: after the project is completed, the annual operating income will be 140 million yuan, the net profit will be 26 million yuan, the return on investment will be 28.2%, the investment payback period will be 5.01 years, and 160 jobs will be provided.

Preliminary preparations: Zhejiang Baoye group and East China Architectural Design and Research Institute Co., Ltd.

have communicated with Karamay District, understood the construction market of our city, and investigated the supporting project site of the precast construction base.

Project cooperation mode: sole proprietorship and cooperation.

Prepared by: Urumqi investment and Trade Center.

Contact: Fan Xiangdong telephone: 13999319151 official account: invest in Karamay long, pay attention to our two-dimensional code, click here to enter the investment platform micro official website..