Ningbo New Materials Joint Research Institute phase I apartment project is located in the southeast corner of Guisi startup area, the core area of Ningbo New Materials Science and Technology City, east of Zhenhai new town and east of Wanghai Avenue.
The land for phase I startup project is about 78 mu, with a total construction area of 190000 square meters.
The project specifically includes scientific research plant, pilot plant, public technology center, etc., of which 6 application engineering centers will be set in the public technology center.
The interior corridor of the talent apartment building and the talent apartment will adopt the energy wall system.
The total quantity is about 12000 square meters.
Project Name: Ningbo New Materials Joint Research Institute phase I project type: talent apartment project location: Ningbo project scale: 12000m2 Ningbo New Materials Joint Research Institute phase I is a new materials industry university research collaborative innovation platform built by the government, making use of the existing basic advantages of the high tech Zone (new materials science and Technology City) to integrate the military academy Ningbo Institute of materials, Chinese Academy of Sciences and other domestic top R & D institutions have introduced and cultivated several application research institutions as R & D entities.
Aim at international cutting-edge technologies, carry out applied research and transformation of scientific and technological achievements, incubate original projects, and lead the rapid development of new material industry.
We can participate in the decoration of phase I apartment project of Ningbo Joint Research Institute of new materials.
What are the advantages of precast decoration in talent apartment project, and we can tell you one by one.
01 rest assured that the manufacturing process is environmentally friendly, and the assembly site is environmentally friendly.
Compared with the traditional decoration process, wood such as particleboard, fiberboard, glue and lacquerware will release harmful gas, and the assembly decoration emphasizes the customized production of parts.
The decorated parts have been dealdehyded and cut before leaving the factory, and the parts only need to be simply assembled after they arrive at the construction site, Dry construction, no dust, no formaldehyde, green, safe and environmental protection, no pollution to ecological and environmental protection, can achieve zero emission of harmful substances, truly live and install without worry.
02 comfortable choice of intelligent manufacturing, quality assurance and independent innovation and R & D of assembly decoration intelligent manufacturing production line for Industry 4.0.
The standardized and process factory production mode reduces the production error, significantly improves the accuracy of parts and components, and the industrial qualification rate reaches 99.6%, ensures the good quality of each part and component, and realizes the stable quality higher than the national standard, At the same time, the factory customized production reduces the complex construction procedures in the traditional decoration, simplifies the types of construction work, eliminates the large number of people and complex processes in the traditional decoration process, and improves the accuracy by 90%.
It solves the problem that it is difficult to guarantee the decoration quality caused by mass construction in a short time.
03 worry free, lightweight operation and maintenance, convenient renovation and assembly decoration system is based on the positive design of BIM.
Through the BIM data model, not only the quality can be traced, but also the operation and maintenance can be simpler.
Through words, images and other means, the property operator can clearly understand the concealed works in the room and the service life and replacement cycle of parts and components.
At the same time, the unique reversible assembly of precast decoration also meets the needs of local maintenance and repeated renovation of talent apartments.
Make the operation of talent apartment more efficient and the cost more optimized.
04 Changxin’s choice of fine supply, rapid construction and assembly decoration system with all products, whole process and whole technology are more mature, reliable and efficient in the design, manufacturing, supply and construction of parts of the whole house.
In addition, we can integrate the three core competencies of design, manufacturing and supply, and cooperate with experienced construction pioneers to complete the decoration task with high quality in a very short construction period and achieve win-win cooperation.
The mature part system, perfect manufacturing process and lightweight operation and maintenance system have greatly improved the applicability and safety of and can assemble decoration.
While taking into account the construction period and quality, it can effectively reduce the problems of safety and environmental protection, as well as the difficulty of demolition, modification and maintenance in the later stage.
Such a perfect and reasonable decoration method is simply “tailored” for talent apartments-.