Project Overview: yanheng Binhai Bay Garden (section a of phase I) project is located in the east of Tianguan 1st Road and the south of Chuangxin South Road in high tech Zone.
The land area is 15154.74 square meters, and the nature of the land is class II residential land; The planned total building area is 56250.49 square meters.
Our company undertakes the construction of prefabricated buildings for 4 ordinary residential buildings in section a of phase I of the project.
The types of prefabricated components used include prefabricated laminated panels, prefabricated air-conditioning panels, prefabricated stairs, prefabricated internal partitions, prefabricated bay windows and prefabricated external walls, which all meet the requirements of Zhuhai that the single prefabrication rate is not less than 20% and the single assembly rate is not less than 40%.
On March 8, 2022, our company organized the owner, the constructor, the supervisor and the designer to our company for joint acceptance of the molds.
After the acceptance, the project components officially entered the pre production stage.
Main processes: 1.
Project disclosure in the conference room; 2.
Acceptance of laminated plate molds; 3.
Acceptance of stair molds; 4.
Follow up work for acceptance of window molds.
At present, our company has completed the production of the first floor components, and the first batch of components will be mobilized at the end of this month according to the project requirements.
Our company will guarantee the quality and quantity, and complete the delivery and acceptance on time.
Wechat zyjkj-2016..