On January 11, the cable trench at the entrance of tangdiling tunnel and small prefabricated components of Division I passed the first piece evaluation and acceptance of the project department, providing experience reference and technical standards for subsequent construction.
The acceptance team is composed of project department, engineering department, safety and quality department and relevant personnel of each division.
The evaluation and acceptance shall be carried out by combining on-site inspection and inner page query.
The acceptance team shall conduct on-site inspection on the comprehensive grounding, structural size, position, elevation control, waterproof and drainage, physical appearance, etc.
of the tunnel trench cable tray; Evaluate and demonstrate the prefabricated component yard in terms of tooling implementation, processing process parameters, concrete performance adjustment, component appearance quality, finished product control, whole process management, etc; At the subsequent evaluation meeting, the acceptance team listened to the report of a division on the first article summary, and checked the first article project standardization management, quality records and resource allocation, physical quality certification materials and other office materials.
The first piece acceptance has a high guiding significance for standardizing the project construction.
Through the first piece calibration, the construction technical standards, installation standards and process standards have been unified, the awareness of high-quality products has been enhanced, and the project quality management level of our bid section has been effectively improved.
Prepared by Yang Ruishi, Wang Zhuojun, edited by Zhou Mengtao and sun Jiayan, edited by Huang Shengyang..