Finishing | Douding construction Hengsheng building project Hengsheng building project is the first precast construction project with high prefabrication rate and high assembly rate in Guangzhou.

The structural form is: assembled integral frame – cast-in-situ shear wall structure; The peripheral protective structure adopts unit structure curtain wall.

Scope of precast components: columns, primary and secondary beams, laminated floors and balconies; Adopt factory production, assembly construction and information management to implement green construction in the whole process and save 60% water; Energy saving 50%; Saving time 20%; Material saving 20%; Land saving 20%; Save manpower by 40%; Reduce construction waste by 80%.

Project prefabrication rate: calculated according to the standard floor, 60.24%; 36.24% based on single building; Project assembly rate: 78.91% based on standard floor and 54.48% based on single building.

Observe the photo exhibition hall at the construction site, visit the photos, receive the Spring Festival benefits, and click on the pictures.