Description of price information of reinforced concrete prefabricated components in Beijing in April 2020: 1.
The prefabricated building component mold is considered according to the normal processing period, and the price includes freight, component deepening design fees, excluding unloading fees and installation fees.
The unit of measurement of the component is calculated by the component volume, and the components are not provided with decorative surfaces.
The insulation materials that are not separately marked refer to XPS modified extruded plates (thermal conductivity ≤ 0.024), The price difference of other grade concrete components shall refer to the price difference of premixed ordinary concrete.
For different steel content, it can be adjusted according to the actual steel content and the current cost information price of 8-10 Grade III hot rolled ribbed steel bars.
Source: Beijing Municipal Commission of Housing and Urban Rural Development, Shanghai, April 2020 Price information of PC prefabricated components in Shanghai Source: Shanghai Municipal Commission of Housing and Urban Rural Development, Anhui Province, April 2020 Price information of prefabricated building components in Hefei Remarks: 1.
The concrete strength grade of the components with the above price information is C30, and the component prices of other concrete strength grades are adjusted according to the current price of ready mixed commercial concrete.
2.
If the steel content of the component with the above published price information changes, it shall be adjusted according to the corresponding steel price of the current period.
3.
The components with the above published price information do not include sleeves, and the actual cost is calculated at 18 yuan/piece.
4.
The components with the above published price information do not include finishing layers.
5.
The components with the above published price information do not include unloading fees and stacking rack rental fees.
6.
The insulation connector is fiber reinforced plastic connector (FPR).
7.
The above published component price information is mainly based on the transaction price level of some prefabricated housing projects in Hefei, taking into account the original price of materials, freight and miscellaneous charges, transportation loss fees, and procurement and storage fees.
Source: Hefei Urban and Rural Construction Bureau, Liaoning Province, April 2020, Shenyang Prefabricated Building Prefabricated Component Market Guiding Price Remarks: Shenyang Prefabricated Building Prefabricated Component Market Guiding Price, which can be used as a reference price for project cost, is issued by Shenyang Prefabricated Building Association.
Source: Shenyang Prefabricated Building Association Shandong Province April 2020 Jinan Prefabricated Component Price Information Remarks: The above prices include taxes and freight, excluding unloading fees.
(The component price is adjusted according to different drawings and specifications) Source: Jinan Engineering Cost Information Network, Qingdao prefabricated component price information in April 2020 Note: 1.
The PC component price is the price of arriving at the site (transportation distance is within 80km), excluding the cost of unloading and on-site stacking frame; 2.
The price of sandwich insulation board includes XPS/insulation connectors, etc; 3.
The volume of PC components (including sandwich insulation board) shall be measured according to the peripheral dimensions of components; 4.
The concrete grade in this price is C30, and every additional grade of concrete is 15 yuan/m ³ Adjust.
Source: Qingdao Municipal Bureau of Housing and Urban Rural Development, Jiangsu Province, April 2020, Nanjing prefabricated reinforced concrete component information price Remarks: 1.
This information price is the arrival land price; 2.
The tax rate of the information price including tax is 13%; 3.
PC prefabricated exterior wall panels in the information price are without window openings and with window openings.
PC prefabricated exterior wall panels need to be adjusted on time; 4.
If the steel content of various components is different, the price can be adjusted according to the actual situation; 5.
This price only includes the cost of raw material testing, excluding the cost of structural performance testing and on-site component testing; 6.
The prefabricated components in the published price include water and electricity embedded labor and material costs (excluding casing costs, which are separately calculated).
Source: Nanjing Engineering Cost Management Association April 2020 Suzhou prefabricated reinforced concrete component information Price Note: 1.
The published price is the price of arriving at the construction site (including unloading and stacking at the specified location, and the support is stable).
The actual steel content and transportation distance are different, so it will be adjusted according to the actual situation.
2.
The price of sandwich insulation board includes polystyrene board, insulation connectors, etc.
3.
The published price includes the additional cost of labor and materials for embedded water and electricity conduits, casings and junction boxes.
4.
The published price does not include the cost of finishing materials.
5.
The published price does not include the cost of door and window frame installation, materials and door and window frame protection.
6.
The calculation of component quantities shall be in accordance with Chapter IV of Jiangsu Prefabricated Concrete Construction Engineering Quota (Trial), the calculation rules of the quantities of finished component manufacturing reference quota.
7.
The published price is determined according to the raw material price and the supply and demand of components.
Source: Suzhou Engineering Cost Management Association Reference price of PC prefabricated components for Nantong building industrialization in April 2020 Remarks: 1.
This price is the price of components arriving at the construction site (within 25km), excluding unloading fees; 2.
The price includes tax, and the tax rate is 13%; 3.
This price only includes the cost of raw material testing, excluding the cost of structural performance testing and on-site component testing.
4.
The volume of PC components is measured according to the peripheral dimensions of the components, including the volume of sandwich insulation board.
5.
The prices of various components can be adjusted according to the construction period of the project and the changes in the steel content of components; 6.
Prefabricated exterior wall panels are ordinary components without lines.
If there are special lines, they shall be adjusted according to the actual situation.
7.
The water and electricity embedded materials included in the reference price of prefabricated components are ordinary brands..