The comprehensive pipe gallery project is an important infrastructure construction project, whose main purpose is to solve the problems of chaotic underground pipeline laying, frequent excavation of road surfaces, dense overhead line networks, and frequent pipeline accidents in cities. By constructing a tunnel space underground in the city, electricity, communication, heating, gas, drainage, etc. can be connected Multiple municipal pipelines are integrated and equipped with specialized maintenance ports, lifting ports, and monitoring systems to achieve unified planning, design, and construction management of these pipelines. Not only does it improve the efficiency and quality of urban operation, but it also helps to reduce traffic congestion and other related problems caused by repeated excavation of road surfaces. The comprehensive pipe gallery is an important infrastructure for ensuring urban operation..
Plastic steel formwork is a new type of building formwork that combines the advantages of traditional steel formwork and wood formwork, and has the following advantages..
The template splicing is tight and flat, and the surface smoothness and smoothness of the concrete structure after demolding are good, without the need for secondary plastering, saving labor and materials..
The template is lightweight, with a trial design of the socket, which can be quickly installed and disassembled, improving construction efficiency, saving labor costs, and reducing overall construction costs..
Plastic steel formwork has high strength and durability, cold resistance, high temperature resistance, no shrinkage, no cracking, no deformation, stable size, alkali resistance and corrosion resistance, and long service life..
The types, shapes, and specifications can be customized according to the design drawings, with multiple turnover times, and can be cycled about 80-100 times, with low usage costs..
Plastic steel formwork is an energy-saving and environmentally friendly product that facilitates the maintenance of clean and hygienic construction sites. At the same time, waste formwork can be recycled and reused with zero waste discharge..
Factory address: No. 11 Daying Industrial Park, Fumin County, Kunming City, Yunnan Province.
Office Address: 28th Floor, Business Building, Building 1, Xindu Longcheng, Beijing Road, Panlong District, Kunming City.