After the concrete structure is poured and reaches a certain strength, the formwork can be removed.
The construction site mainly determines when the formwork can be removed based on the strength of concrete test blocks cured under the same conditions, and the specific formwork removal date should be determined according to the structural characteristics and the strength achieved by the concrete.
.