Before the construction of steel bridge deck pavement (including trial road pavement construction), the necessary mechanical equipment, testing and inspection equipment, pavement materials, and on-site mix design, test mixing and sampling performance testing, raw material performance inspection, and detailed construction organization design should be prepared according to the contract requirements.
Management and technical personnel should be present.
.