December 25, 2024

The full record of assembly construction, all you want to know is here!

The precast implementation rate of the project is 50%.

The precast components are mainly composed of some shear walls, balcony plates, equipment platform plates, bay windows and stairs.

█ PC construction process record of poly Pingliang 18 neighborhood residential project █ component production ▲ material sampling and inspection in component factory ▲ mold making ▲ positioning ▲ pouring preparation of sand lowering components ▲ formwork removal ▲ component factory storage ▲ stair components █ component transportation ▲ component factory loading and transportation ▲ component mobilization ▲ component storage and hoisting ▲ component storage after mobilization ▲ various inspections before component unloading ▲ The component truck arrives at the site and waits for unloading ▲ component type ▲ stair component ▲ balcony component ▲ component on-site storage █ component hoisting ▲ stair plate hoisting ▲ wall plate diagonal bracing at the stair ▲ component measurement and verticality ▲ component alignment installation ▲ component lower support ▲ component lower gasket ▲ component diagonal bracing ▲ balanced hoisting ▲ electromechanical pipeline connection ▲ curtain wall embedded parts ▲ mechanical checking █ component grouting ▲ grouting Pressure gauge inspection of grouting machinery ▲ speed test of grouting machinery ▲ plugging mortar on site ▲ prefabrication and purchase of grouting plugging ▲ mixing of grouting materials ▲ placing grouting materials in the machine ▲ plugging of grouting openings ▲ cleaning laitance ▲ retaining test blocks ▲ cleaning equipment ▲ grouting machine █ necessary for construction ▲ hoisting team ▲ hoisting appliances ▲ hanging traction rope under components ▲ balance crane ▲ embedded rivets ▲ storage appliances ▲ different Thickness type gasket ▲ lower rubber strip of component ▲ layout of cantilever I-beam ▲ layout of embedded parts of cantilever I-beam █ work of cast-in-situ part ▲ reinforcement connecting sleeve of cast-in-situ section ▲ stirrup binding of cast-in-situ section ▲ roof back support of cast-in-situ slab on PC floor ▲ roof back reinforcement of PC component carriageway ▲ roof back reinforcement of component storage yard ▲ support reinforcement of stair bearing platform ▲ roof back support of balcony Source: zhulongxm project management (ID: zhongxm).

Identify the QR code in the figure or click【.