Example around Jiang Zhiwei, component branch: a dream chaser who runs hard

In 1991, with the roar of the rumbling train, a young man with a dream set out from Liyang, Jiangsu Province, walked more than 1000 kilometers, came to Beijing with excitement and a little uneasy mood, and became a resident.

This young man is Jiang Zhiwei.

He grew up step by step from a primary school student living in the repair shop of the general machinery construction company.

After 30 years, the once young man has transformed into a mature, steady and responsible leader – the manager of the component branch of the Municipal Department of the general railway.

“In the past, I have suffered all kinds of hardships in engineering, and now I am much happier than before,” Jiang Zhiwei always lamented when recalling the past.

In July 2015, Jiang Zhiwei was transferred to component branch.

At that time, the construction of Beijing subway was in the low peak period of development, and the component branch was basically in a “idle” state.

Jiang Zhiwei, who has just taken office, is very worried: it must not go on like this.

The development of the enterprise depends on one word “doing”.

If there is no work, how can we become stronger and bigger? However, in the field of segment processing, Jiang Zhiwei was also a novice at that time.

In order to master the company’s work process as soon as possible, he often took the initiative to discuss the operation of the branch with the old employees of the unit, and organized employees to hold meetings to discuss, brainstorm and draw the future blueprint of the component branch with everyone.

At that time, one of his most common words was “lying in bed at night, you can’t sleep because of work, that’s right.

There are many things that you have to understand carefully.” The segment production of the component branch is generally two shifts.

In order to find out the production process, he spent many nights in the unit.

Whether it is raw materials entering the factory, reinforcement processing, concrete pouring, segment steam curing and finished product curing, he carefully observes and supervises them one by one, and knows them all in a very short time.

In order to ensure the quality of segment finished products, Jiang Zhiwei has insisted on adopting the method of pool maintenance in the past six years.

The tank maintenance segment has high strength and good effect, but the cost is high and the process is complex.

Few enterprises can adhere to this in the segment production field in Beijing.

Jiang Zhiwei said: “quality is the last word.

If we want to develop and grow in the field of segment production, we must play a gold lettered signboard in terms of quality”.

In addition, by sending special personnel to the site for real-time quality supervision, timely problem feedback and other extended services, he timely understands the site dynamics and provides a strong guarantee for the promotion of shield machine.

Under the guidance and help of the leaders of the group and the Municipal Rail Transit Department, Jiang Zhiwei led the branch team to take the initiative, contact with many parties, grasp the market dynamics in time, and further expand the popularity and influence of the component branch in the field of segment production.

The branch team has always maintained the enthusiasm of always striving for the first product quality among the segment production enterprises in Beijing.

In December 2016, the branch was responsible for the segment production of the East extension lot 02 of Metro Line 7 and the South extension lot 01 of Batong line.

In order to improve production efficiency, Jiang Zhiwei rented three sets of molds from his brother units on the basis of the original molds.

Due to the limitation of workshop space, he organized the staff to place the three sets of molds outside the workshop for use.

On the basis of the original two sets of mixing units and one set of air compressor unit, he newly equipped one set of mixing unit and one set of air compressor unit respectively.

These measures have greatly accelerated the production progress, and finally achieved good results in the maximum daily production capacity of 32 rings, the maximum monthly production capacity of 751 rings and the maximum annual production capacity of 7001 rings.

At the same time, the benefits of the component Branch continued to grow steadily.

At this time, Jiang Zhiwei gradually grew from a “ignorant” layman to a skilled “veteran” in the segment processing industry.

Since then, the branch has added 13 sets of 6.4m segment production molds on the basis of the previous 12 sets of segment production molds with a diameter of 6m, further expanding the production scale and enhancing the market competitiveness.

Since Jiang Zhiwei became the manager, the component branch has successively undertaken the segment processing tasks of Metro Line 8 phase 3 lot 09, line 7 East extension lot 02, Batong Line South extension lot 01, line 17 lot 04, line 12 Lot 14 and line 12 lot 17.

In October last year, the component branch won the segment processing project of Beijing Metro Line 12 lot 19 and line 3 lot 05, It has created a good achievement with a cumulative bid winning amount of 150 million for three consecutive years, demonstrating the strong strength of the component branch in market development.

These eight segment processing projects have processed 30260 segments in total, which has contributed to the construction of Beijing subway.

Since taking part in the work, Jiang Zhiwei has won the honorary title of “excellent Party member” for many times.

At work, in order to ensure production safety, he visited the plant and workshop many times every day, no matter wind or rain.

In life, he seriously thought about how to make employees happy.

For example, installing awnings in dormitories and office areas solves the problem that doors and windows are easy to get wet in summer; Make full use of idle boards to build activity rooms for employees, which solves the problem that employees are inconvenient to go out for leisure exercise due to remote geographical location.

The plant area of the component branch is backed by towering mountains and far from the urban area with bright lights and high-rise buildings.

It has a wide field of vision, and the stars are the most common.

During his stay here, Jiang Zhiwei will occasionally let himself get away from his busy work, put down his fatigue and look at the stars.

This is his unique way to relax.

“Rest is to better fight,” Jiang Zhiwei often said.

“Dream is the determination and motivation to stick to it.”..