Feed engineering prefabricated parts focus on details | Feed Engineering

Feed engineering prefabricated parts focus on details | feed engineering prefabricated parts have been widely used in feed engineering.

Prefabrication and on-site assembly have become the mainstream of engineering installation.

The design details of prefabricated parts determine the effect difference of project quality.

Let’s feel one or two together.

1.

General classification of prefabricated parts 2.

Chute of prefabricated parts is the main part of equipment connection for engineering installation, and the processing and installation requirements need to be emphasized.

Like the small silo body, the inner wall of the chute in the premix core material configuration section often needs internal polishing to reduce the risk of material hanging, residue and cross pollution.

The reliable sealing mode between chutes determines the sealing effect between chutes and has an important impact on the dust control of the whole project.

There are two common sealing forms.

Briefly introduce: the first sealing form: sealant strip on one side of pipe wall.

The second sealing form: the sealing strip on the inner side of the clamp, which is common.

3 commonly used prefabricated parts include elbow and tee: it is attached with a certain thickness of polymer material to improve wear resistance, antistatic and minimize the generation of dust and sparks.

Clamp flange: universal adjustment elbow: 360 ° space installation angle adjustment, easy and convenient.

Hand hole, observation hole: round, square and other manual flow regulating valves: manual flow stop valve: diversion and collection section: manual tee: Summary: prefabricated parts are not only conducive to the rapid delivery of installation, but also conducive to the production and maintenance of the user.

Standardization of prefabricated parts is also a win-win choice-.