Key points of deepening the construction of precast concrete components

The construction of concrete precast units has distinct forerunner and reference.

Therefore, we must strive for perfection in detail and as a whole to ensure that the quality of each batch of components can match the actual needs of construction.

1.

Decision making} this stage is mainly aimed at the implementation scheme decision of concrete precast units.

2.

Once problems are found, they should be reflected and handled in time, and the communication and exchange between various departments should be strengthened to ensure the safety and stability of quantitative production.

Therefore, to grasp the focus of work at different stages, the general requirements can be listed as follows.

The main body of concrete precast parts shall design the drawings of component deepening design according to the key points of decision-making scheme.

For the first article, various raw materials required in component manufacturing shall be inspected and reviewed before entering the actual construction, including material quality inspection report, material supplier qualification, material commissioning, etc.

Implementation} this stage is mainly the inspection and review of component deepening results.

This process is not achieved overnight.

It is necessary to repeatedly confirm and review the drawings to ensure the high level of deepening work, which also has high requirements for the technical level of the main body.

This is mainly to ensure the quality and efficiency of concrete precast units.

It is almost the core guidance for the follow-up construction of the whole construction project.

In the process of specific implementation, it mainly depends on the main body of concrete precast units to consult and understand the building construction in advance.

The main body of concrete precast units should properly participate in the finalization of building construction drawings, study and analyze their drawings, and find out the key points of deepening component design.

3.

Pfeifer VS Box

Different component links have different characteristics and actual construction needs, so it can not be generalized.

The main work in this stage of design is to deepen the design of building construction drawings.

The main purpose of this practice is to ensure the scientific and reasonable work and avoid unnecessary repetition of steps.

The component deepening of concrete precast units is a relatively cumbersome work, and the overall process takes a long time, with distinct periodicity and complexity.

If there is infringement, please contact to delete it)..

This article comes from the Internet.

The focus and direction of deepening components should be established to provide reference basis for subsequent specific design.