On April 15, the first hoisting ceremony of prefabricated structural members was held for the east project of Xiaojing new village.
Under the command of the on-site management personnel, the prefabricated components fell into the established position slowly and accurately, marking that the dressed and matched construction project officially entered the substantive construction stage, and the first hoisting ceremony was a complete success.
The main horizontal structure of the project 1-6# building in the east area of Xiaojing new village adopts prefabricated components, and the standard floor of the main structure adopts aluminum alloy formwork, which has achieved great results in energy conservation and consumption reduction, green environmental protection, building quality and so on—————— Long press the QR code to follow us..