December 25, 2024

Live a small life

Recently, the small component prefabrication plant of Linghua No.

2 division welcomed the peer observation and exchange of Gansu public transport construction G312 project.

In the construction in the north, the maintenance under the condition of low temperature has become the number one problem in the prefabrication operation.

In order to enable each small component to enter the front line and play its role in the most perfect state, the project specially arranges a “standard room”, and sets up multiple automatic steam curing rooms in the Prefabrication Yard for small components to “stay in containers” and realize standardized curing.

The small components born here will be used in all platform drainage ditches, intercepting ditches, arch skeleton protection and other parts of the project, so as to help the early completion of major projects of Gansu Shaanxi Provincial high-speed interconnection and inject power into regional economic development.

The prefabrication plant with factory construction layout is equipped with concrete mixing area, automatic component production line area, spray curing area, mold storage area, mold cleaning area, finished product storage area, sample display area and other functional areas to form a fixed modular production line.

Bend Loop

The practices of standardized, intelligent and refined construction and safety and quality management have been unanimously praised by the observation group.

Source: Linghua Division 2 contribution: he Linlin, Tian Mengying..

At the same time, combined with the actual situation of the project, it constantly innovates management ideas, strengthens the summary and acceptance of the first piece system, takes multiple measures to strengthen management, and ensures high quality and beautiful appearance of components.

Linghua No.

From processing, maintenance to storage, small components have lived a “delicate life” here.

It can also show the prefabrication construction technology and management method of small components that can be popularized to the whole bid section.

In order to maximize the quality control of small component production, Linghua Division 2 strictly implements 6S management, machining mechanization, automation, intelligence, project quality management standardization and construction process standardization in the construction process.

2 branch has built a standardized small component prefabrication plant according to the requirements of quality engineering.

The prefabrication plant has beautiful environment, reasonable layout, convenient transportation and complete functions, which can meet the standardized construction needs of orderly parking of vehicles and equipment, orderly stacking of materials and materials, smooth drainage in the construction area, smooth travel of personnel and smooth and unobstructed construction access roads.

The total construction task of the Prefabrication Yard is about 20000 square meters.