The long edge should be wrapped with the short edge, and the template should be horizontally arranged as much as possible, with accurate dimensions..
Reserve formwork reinforcement connectors at the joints of the upper and lower layers of the exterior wall to ensure a tight joint..
The position of the side wall (column) template must be controlled by both the axis and plumb line..
The horizontal construction joint of the staircase is good, with no slag inclusion, and the concrete is dense.
The edge concrete slurry of the template corner joint must be cleaned thoroughly before each layer of formwork is placed to ensure that the corner joint is tightly assembled.
When the opening of the reinforced concrete structure is ≤ 800mm, an additional upright pole should be added in the middle of the formwork support.
When the opening of the reinforced concrete structure is greater than 800mm, one to two horizontal bars should be added to the middle of the formwork support.
“Disclaimer: This article is sourced from the internet and is not an original article on the hotel engineering communication platform. The reproduced content is for learning and communication purposes only. The opinions expressed do not represent the position of the hotel engineering communication platform. The copyright belongs to the original author. If there is any infringement, please contact us to delete it. Thank you.”.