After accepting the construction site commission, the first step is to grasp the basic situation of the engineering structure; Consider using this method to detect adaptability.
This method is applicable to both plain concrete structures and reinforced concrete structures; Generally not applicable to prestressed structures, nor suitable for structures with strength grades lower than C10.
The commissioning unit should be required to provide the following information: ① Project overview; ② Types, dimensions, and quantities of structures or components; ③ The concrete grade used in the design; ④ Molding date, raw material and concrete test block compressive strength test report; ⑤ Records of the quality status of structures or components and problems encountered during construction; ⑥ Related structural design drawings and construction drawings.
.