December 25, 2024

Good news official announcement! “Shenzhen precast construction industry base”, here we are

On January 10, 2022, Shenzhen housing and Construction Bureau issued the announcement of Shenzhen housing and Construction Bureau on Issuing the list of the second batch of cast construction industrial bases in Shenzhen.

11 units were identified as the second batch of cast construction industrial bases in Shenzhen, among which China Construction Third Bureau Group (Shenzhen) Co., Ltd.

was listed.

Demonstration and achievements the company actively responds to the national guidelines and policies of “industrialization, informatization and greening”, implements the spirit of the guiding opinions of the general office of the State Council on vigorously developing precast buildings and the action plan for carbon peak before 2030, and has been engaged in technology research and development, standard preparation, demonstration project construction A lot of exploration and research have been made in the fields of construction and installation.

The company submits the feasibility study report of China Construction Third Bureau Group (Shenzhen) Co., Ltd.

on Shenzhen precast construction industry base to Shenzhen Municipal Bureau of housing and urban rural development, and establishes a leading group to promote the work of the base from top to bottom.

In order to build the core competitiveness in the field of precast buildings, actively participate in the compilation of relevant codes and standards for precast buildings, so that the design, production, construction and management of precast buildings “have laws to follow”.

1 published a paper in the Journal of construction engineering technology and design, 2 participated in the compilation of one group standard, and issued 3 successfully approved a sub project of national key R & D plan in Shenzhen Industrialization Association, and completed the project acceptance.

4 authorized 23 national patents in the field of assembly.

Since the company jointly completed the first industrialization project with Vanke in 2007, It has successively undertaken more than 20 precast projects in Shenzhen, with a cumulative construction area of more than 3 million square meters.

The precast buildings under construction cover residential, office, commercial, hospital and other building types.

The shantytown reconstruction project of Haile garden in Bao’an District 39, a representative project, is located in Bao’an District, Shenzhen, with a total construction area of 117000 square meters and a maximum building height of 141.3 meters.

It includes four talent houses and one kindergarten, of which all four talent houses adopt precast design.

The precast components include precast bay windows, precast balconies, precast stairs and precast internal partition boards, with an overall assembly rate of 56%.

Located in Nanshan District, Shenzhen, the high tech apartment shanty town reconstruction project in Nanshan District is composed of three towers in the South District, three apartment buildings in the North District and a kindergarten.

It has a total construction area of 350000 square meters and a maximum building height of 188.5 meters.

It is close to gaoxinnan subway station of line 9.

Precast components are used for assembly construction on the standard floor of the tower.

All 6 towers in the north and south areas are cast buildings, of which the North 1# building is the highest cast building under construction in China.

Plot 02-03 of urban renewal unit of Hezheng Longteng Industrial Zone (phase II) is located in Longgang District, Shenzhen, with a total construction area of 323000 square meters and a maximum building height of 146.9 meters.

It is composed of 6 super high-rise residential buildings and 3 high-rise residential buildings, of which 9 residential structures are shear wall structures, all of which adopt precast design, and the precast components include precast bay windows, laminated plates The assembly rate of metal floor bearing plate and light partition floor is 54.6%.

Bid section II (2#, 4# plots) of Shenzhen Vanke Shajing Shangxing project is located in Bao’an District, Shenzhen, with a total building area of 220000 square meters and a maximum building height of 135.25 meters.

It is composed of two high-rise residential towers and nine super high-rise residential towers.

The precast components used include precast external wall panels, precast balconies, precast breast boards, precast air-conditioning panels and precast internal wall panels, with an assembly rate of 54.85%.

Looking forward to the future ✦ this time, we will be rated as the second batch of precast construction industrial bases in Shenzhen.

We will continue to give full play to the special role of central enterprises in the development of the construction industry, base ourselves on Shenzhen and face the construction market in Guangdong, Hong Kong and Macao, and form an integrated platform for precast architectural design, production, R & D, in the development, design Build a demonstration base for coordinated development in the whole process.

Source of material | author of Technology Department (Technology Center) | Wu Chengyun reviewed | Party Construction Department of Technology Department (Technology Center)..