How to improve the quality of cantilever components
According to the inspection of project quality for many years, it is found that there is a kind of quality problem. Although it has been …
Profession Shuttering Magnet Factory
According to the inspection of project quality for many years, it is found that there is a kind of quality problem. Although it has been …
In the afternoon of January 13, the component branch company held the 2022 annual work summary and 2023 annual work deployment meeting of “Striving for …
This article is only for communication and learning WeChat point. Please pay attention to our latest engineering recruitment collection (mostly after the year). If you …
At present, in the construction of expressway, the requirements for the internal and external quality of high-performance concrete components are higher and higher, and the …
Click the small program to sign up for the China • Tianjin 2021/6/24-6/25 Prefabricated Concrete System Design and Production Seminar – “How to avoid internal …
The manufacturing problems of prefabricated components mainly include missing edges and corners, irregular edges and corners, warping unevenness, flying out of ribs, etc; Pitted surface, …
Recently, the production and processing project of PC non-load-bearing components in the comprehensive reform zone undertaken by the company has successfully passed the pre-acceptance of …
The production and application of prefabricated prefabricated components and concrete box culverts in European buildings were investigated and heard from Shen Bing1, Liu Hao2, Chen …
Source: Even though the connection mode of the prefabricated structure has been greatly optimized at present, the quality hazard of the component connection nodes still …
Copyright statement: from the network; We are committed to protecting the copyright of the author. The source of the content has been indicated. It is …